地盤工学 · 沈下
限界動水勾配 icrit
パイピング/ボイリングの限界動水勾配: icrit = (γsat - γw) / γw。
Catalog formula, not a design. Check input values, coefficients, and limits against the standard and its national annex.
Formula and quantities
| Symbol | Name | Unit | Note |
|---|---|---|---|
| 地盤の飽和単位体積重量 | kN/m³ | ||
| 水の単位体積重量 | kN/m³ | ||
| 限界動水勾配 | – | Result |
例題
= 20 kN/m³ · = 9.81 kN/m³
= 1.0387 · Source: EN 1997-1:2004 第10.3条
Scope and standard
EN 1997-1第10.3項に基づく上向き浸透流によるボイリング照査。
- Standard
- EN 1997-1:2004、10.3項、式 (10.2)
- Result
- (dimensionless)
Reference to clause and equation, no standard text. The description is written in our own words.
Try it
Continue with Mia
Fills the input field in CALC; nothing is sent until you send it.
No matching formula yet? Find the right calculation rule.
Describe what you want to determine. Mia searches the formula catalog first and clarifies assumptions before anything is calculated.
検索は地盤工学 › 沈下で開始されます。
Miaknows the formula catalog and asks for what is missing.