Ontwerp · Staal

Benuttingsgraad vermoeiing voor schuifspanning (EN 1993-1-9)

  • Type: Controle
  • Versie 1
  • beoordeeld op 24-11-2026

Benuttingsgraad voor de vermoeiingscontrole voor schuifspanningsvariaties volgens EN 1993-1-9 artikel 8(1): ηfv = (γFf · ΔτE,2) / (ΔτC / γMf).

ηfv=γFf⋅ΔτE,2ΔτC/γMf\displaystyle \eta_{fv} = \frac{\gamma_{Ff} \cdot \Delta\tau_{E,2}}{\Delta\tau_{\mathrm{C}} / \gamma_{Mf}}
  • EN 1993-1-9:2005
Apply in CALC

Catalog formula, not a design. Check input values, coefficients, and limits against the standard and its national annex.

ΔτCηfvΔτE,2

Formula and quantities

SymbolNameUnitNote
γFf\displaystyle \gamma_{Ff}Partiële factor voor equivalente spanningsvariaties met constante amplitude1
ΔτE,2\displaystyle \Delta\tau_{E,2}Schade-equivalente schuifspanningsvariatie bij 2 miljoen wisselingenN/m²
ΔτC\displaystyle \Delta\tau_{\mathrm{C}}Referentiewaarde schuifvermoeiingssterkte van de detailcategorie bij 2 miljoen wisselingenN/m²
γMf\displaystyle \gamma_{Mf}Partiële factor voor vermoeiingssterkte1
ηfv\displaystyle \eta_{fv}Benuttingsgraad vermoeiing voor schuifspanning (<= 1,0)1Result

Uitgewerkt voorbeeld

γFf\displaystyle \gamma_{Ff} = 1 · ΔτE,2\displaystyle \Delta\tau_{E,2} = 40.000.000 N/m² · ΔτC\displaystyle \Delta\tau_{\mathrm{C}} = 80.000.000 N/m² · γMf\displaystyle \gamma_{Mf} = 1,15

ηfv\displaystyle \eta_{fv} = 0,575

Standard and source

Standard
EN 1993-1-9:2005
Result
ηfv\displaystyle \eta_{fv} in 1

Reference to clause and equation, no standard text. The description is written in our own words.

Try it

Unit system
ηfv\displaystyle \eta_{fv} = 0,575 1= ((1 1) · (40.000.000 N/m²)) / ((80.000.000 N/m²) / (1,15 1))

Continue with Mia

Fills the input field in CALC; nothing is sent until you send it.

No matching formula yet? Find the right calculation rule.

Describe what you want to determine. Mia searches the formula catalog first and clarifies assumptions before anything is calculated.

De zoekactie start over Ontwerp › Staal.

Miaknows the formula catalog and asks for what is missing.

You clarify missing information with Mia in the next step. Nothing is calculated yet.