岩土工程 · 土压力
地锚锚固段长度 Lbond
地锚所需注浆体锚固长度:Lbond = Rak / (π · d · qsk)。
Catalog formula, not a design. Check input values, coefficients, and limits against the standard and its national annex.
Formula and quantities
| Symbol | Name | Unit | Note |
|---|---|---|---|
| 锚杆标准抗拔承载力 | kN | ||
| 地锚注浆锚固体钻孔直径 | m | ||
| 注浆体与土层间的标准侧摩阻力 | N/m² | ||
| 所需锚固段长度 | m | Result |
实例
= 300 kN · = 0.15 m · = 100,000 N/m²
= 6.3662 m · Source: EN 1997-1:2004 条款 8.5.2
Scope and standard
符合EN 1997-1第8.5.2节的注浆地锚设计。
- Standard
- EN 1997-1:2004,第8.5.2条,式(8.2)
- Result
- in m
Reference to clause and equation, no standard text. The description is written in our own words.
Try it
Continue with Mia
Fills the input field in CALC; nothing is sent until you send it.
No matching formula yet? Find the right calculation rule.
Describe what you want to determine. Mia searches the formula catalog first and clarifies assumptions before anything is calculated.
检索将在 岩土工程 › 土压力 开始。
Miaknows the formula catalog and asks for what is missing.