Peripheral horizontal ring tie tensile force Tp = 0.4 · (gk + ψ · qk) · s · L to secure building perimeter according to EN 1991-1-7 Annex A.4 Eq. (A.2).

Tp=0.4⋅(gk+ψ⋅qk)⋅s⋅L\displaystyle T_{p} = 0.4 \cdot (g_{k} + \psi \cdot q_{k}) \cdot s \cdot L
Apply in CALC

Catalog formula, not a design. Check input values, coefficients, and limits against the standard and its national annex.

Formula and quantities

SymbolNameUnitNote
gk\displaystyle g_{k}Characteristic dead weightkN/m²
ψ\displaystyle \psiCombination factor–
qk\displaystyle q_{k}Characteristic imposed loadkN/m²
s\displaystyle sSpacing of perimeter ties/columnsm
L\displaystyle LSpan of the floor baym
Tp\displaystyle T_{p}Perimeter tying forcekNResult

Worked example

gk\displaystyle g_{k} = 5 kN/m² · ψ\displaystyle \psi = 0.5 · qk\displaystyle q_{k} = 3 kN/m² · s\displaystyle s = 6 m · L\displaystyle L = 8 m

Tp\displaystyle T_{p} = 124.8 kN

Standard and source

Standard
EN 1991-1-7:2006, clause Annex A.4
Result
Tp\displaystyle T_{p} in kN

Reference to clause and equation, no standard text. The description is written in our own words.

Try it

Unit system
Tp\displaystyle T_{p} = 124.8 kN= 0.4 · ((5 kN/m²) + 0.5 · (3 kN/m²)) · (6 m) · (8 m)

Continue with Mia

Fills the input field in CALC; nothing is sent until you send it.

No matching formula yet? Find the right calculation rule.

Describe what you want to determine. Mia searches the formula catalog first and clarifies assumptions before anything is calculated.

The search starts in Actions and loads › Accidental actions.

Miaknows the formula catalog and asks for what is missing.

You clarify missing information with Mia in the next step. Nothing is calculated yet.