Ontwerp · Beton

Basiswaarde overspanning/hoogte voor licht gewapend beton (rho <= ρ0)

  • Type: Factor
  • Versie 1
  • beoordeeld op 12-11-2026

Basiswaarde overspanning/hoogte voor op buiging belaste gewapend betonconstructies zonder directe doorbuigingsberekening volgens EN 1992-1-1 vgl. (7.16a).

(ld)=K⋅[11+1.5⋅fck⋅ρ0ρ+3.2⋅fck⋅(ρ0ρ−1)3/2]\displaystyle \left(\frac{l}{d}\right) = K \cdot \left[11 + 1.5 \cdot \sqrt{f_{ck}} \cdot \frac{\rho_{0}}{\rho} + 3.2 \cdot \sqrt{f_{ck}} \cdot \left(\frac{\rho_{0}}{\rho} - 1\right)^{3/2}\right]
Apply in CALC

Catalog formula, not a design. Check input values, coefficients, and limits against the standard and its national annex.

fck

Formula and quantities

SymbolNameUnitNote
K\displaystyle KConstructiesysteemfactor (eenvoudig opgelegd 1,0; eindveld 1,3; tussenveld 1,5; uitkraging 0,4)1
fck\displaystyle f_{ck}Karakteristieke cilinderdruksterkte van betonN/m²
ρ0\displaystyle \rho_{0}Referentiewapeningspercentage (10^-3 * sqrt(f_ck))1
ρ\displaystyle \rhoBenodigd trekwapeningspercentage (A_s / (b * d))1
(l/d)\displaystyle (l/d)Basiswaarde van de verhouding overspanning/nuttige hoogte1Result

Uitgewerkt voorbeeld

K\displaystyle K = 1 1 · fck\displaystyle f_{ck} = 30.000.000 N/m² · ρ0\displaystyle \rho_{0} = 0,0054772 1 · ρ\displaystyle \rho = 0,0054772 1

(l/d)\displaystyle (l/d) = 19,2158 1 · Source: EN 1992-1-1:2004 Vgl. (7.16a)

Scope and standard

Gewapend betonbalken en -vloeren met rho <= rho_0 volgens EN 1992-1-1.

Standard
EN 1992-1-1:2004, paragraaf 7.4.2 (2), Verg. (7.16a)
Result
(l/d)\displaystyle (l/d) in 1

Reference to clause and equation, no standard text. The description is written in our own words.

Try it

Unit system
(l/d)\displaystyle (l/d) = 19,2158 1= (1 1) · (11 + 1.5 · sqrt((30.000.000 N/m²) / 1 [MPa]) · ((0,0054772 1) / (0,0054772 1)) + 3.2 · sqrt((30.000.000 N/m²) / 1 [MPa]) · (max(0; (0,0054772 1) / (0,0054772 1) - 1))¹.5)

Continue with Mia

Fills the input field in CALC; nothing is sent until you send it.

No matching formula yet? Find the right calculation rule.

Describe what you want to determine. Mia searches the formula catalog first and clarifies assumptions before anything is calculated.

De zoekactie start over Ontwerp › Beton.

Miaknows the formula catalog and asks for what is missing.

You clarify missing information with Mia in the next step. Nothing is calculated yet.